3 Fire Stations, 2 States, 1 Team: Lessons Learned from CMAR and Design-Build
Top takeaways from the recent DBIA panel discussion
Leveraging more than 20 years of partnership, McCownGordon and SFS Architecture recently collaborated on three municipal fire stations on both sides of the Missouri-Kansas state line. Representatives from the design and construction team participated in a panel discussion with the owners of the projects to share fresh insights and lessons learned.
While all three projects comprised the same project type and the same project team, there was one major difference—the delivery method. The City of Overland Park utilized the construction manager at risk (CMAR) delivery method, but Central Jackson County opted for the design-build approach. How and why were the respective delivery methods chosen? What was successful? Were there challenges? Read on to learn the disparities between the employed delivery methods and gain valuable insights for future endeavors.
Overland Park Fire Stations 41 & 48: The projects & the delivery methods
The City of Overland Park, Kansas recently completed both Fire Station 41 and Fire Station 48. Fire Station 48 accommodates the community’s recent growth while Fire Station 41 replaced the existing station to address deficiencies and allow continuity of operations.
The City’s top two priorities were the health and safety of the firefighters as well as incorporating gender-neutral spaces within the facilities. The new stations include red, yellow and green zones to mitigate health risks associated with the firefighting profession. This new method of zoning allows the carcinogenic elements firefighters come in contact with to stay in the red zone, separate from their living area which is considered the green zone. The stations have gender-neutral lockers, showers, and bunks to utilize space efficiently.
While the City of Overland Park employs three building delivery methods (CMAR, design-build and design-bid-build), the City chose CMAR for both projects. Tony Rome, Facilities Engineer & Project Manager for the City of Overland Park, noted the CMAR delivery method worked exceptionally well for both stations. The CMAR delivery method fosters early involvement from the construction manager during the design phase, which allows valuable input on constructability, cost estimating, and scheduling, and leads to improved project outcomes like schedule and budget savings, long-term performance for the building, and most importantly, overlooked challenges that could be detrimental to project success.
Having completed 25 projects together, McCownGordon and SFS seamlessly integrated as a team to immediately drive value for the City. “When building these two stations, it really helped to have the architect, designer and contractor in the same room early on,” said Rome. The most prevalent advantage of onboarding McCownGordon early included early procurement of long lead time items such as generators, switchgear and automatic transfer switches to lock in pricing and avoid schedule delays. “Our long-standing-relationship with SFS allowed for early collaboration in turn adding value for the City by identifying creative cost-saving solutions to protect the City’s budget and schedule,” Arlen Kleinsorge, market leader for McCownGordon stated.
Central Jackson County Fire Station 6: The project & the delivery method
Across the state line, Central Jackson County also completed a new fire station, Fire Station 6. McCownGordon and SFS Architecture used inspiration from the City of Overland Park projects and leveraged their knowledge and expertise to bring the County’s goals to life. One of their goals was to create a fire station with a long life cycle that increased efficiency, in turn, increasing community safety. The floor plan was designed with the following in mind:
- Low-maintenance building system
- Increased response times
- Contamination control through implementation of red, yellow and green zones
- Gender-neutral spaces
DOWNLOAD OUR DELIVERY METHODS COMPARISON GUIDE
The panelists at the DBIA-MAR Conference included:
- Tony Rome PE, Sr. Civil Engineer, City of Overland Park, Kansas
- John Heffernon, Battalion Chief, City of Overland Park
- Chisholm Nally, Assistant Chief, Central Jackson County Fire Protection District
- Jeff Frank, Director of Preconstruction, McCownGordon Construction
- Arlen Kleinsorge, Market Leader, McCownGordon Construction
- Kwame Smith AIA, Principal, SFS Architecture
- Lindsay Tatro AIA, Project Manager, SFS Architecture
- Brian Garvey AIA DBIA, SFS Architecture (moderator)
COMPARING THE BENEFITS OF EACH PROJECT DELIVERY METHOD
Choosing the best project delivery method for your construction project can be overwhelming. Our experts evaluated the benefits of each delivery method to help you make an informed decision when planning your next construction project.