
The design-build team guided Garmin through an extensive master plan analysis weighing factors including cost, scheduling, site limitations and disruption to current operations. Garmin opted for a significant overhaul to the manufacturing and distribution needs and built a 750,000 horizontal custom designed facility.
Clean room manufacturing space was added to provide creative and flexible setting for engineering teams and upgraded automation allows for capacity needs. Its custom design provides maximized ability to address the every changing market.


Working on an active campus, the team ensured safety was a key priority. Developing a site-specific safety and logistics plan, the team achieved minimal disruption to existing operations.

