 The facility includes zero-depth entry, a double loop slide, lap pool, bath house, mechanical pump rooms, ticket office and concessions. Split face masonry construction was used with integral color block for the pool house.
To make the area a multi-faceted amenity, the site leaves space for the city to put a future playground. The team integrated seamlessly during the design-build process to provide the best overall value for the City of Greensburg. With a tight budget and fast-track schedule, an aggressive and proactive approach was required to successfully complete the facility in the summer of 2015.