Missouri S&T Trade Partner Information

Get Prequalified Today

Trade Partner Information

Be a part of history with us.

McCownGordon is proud to be part of history as the prime contractor for the construction of the Student Experience Center located at the Missouri University of Science and Technology.

We are committed to the students and families at Missouri University of Science and Technology and building our team with diverse talent by creating opportunities for MBE/WBE/DBE/Veterans and SDVE certified firms to play a meaningful role on the project.

Get Prequalified Today

 

Student Experience Center and Geothermal Plant

Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon

Project Description: New three-story addition and associated site development of the new Student Experience Center for Missouri University of Science and Technology in Rolla, Missouri. The new building includes various collaboration spaces, large lobby/event space and active learning classrooms as well as a connector to the Havener Center. We plan to engage trade partners for the following components: sitework, building shell, finishes, MEP and the buildout of the new geothermal plant.

  • Mobilization: May 2022
  • Completion: September 2023

 

 

 

 

 

LEARN MORE ABOUT THE PROJECT

Virtual Recruitment Webinars

    • Bid Package 1: ERO Webinar: 3/16/2022 at 3pm

    • Bid Package 3: Webinar: 5/24/2022 at 2pm

Bid Package 1 - Early Release Order Information

Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon

ERO Scopes of Work:

  • 03 00 00 – Concrete
  • 05 00 00 – Steel
  • 07 11 13 – Bituminous Damp Proofing
  • 07 40 00 – Roofing
  • 31 00 00 – Earthwork
  • 31 63 29 – Drilled Piers
  • 33 00 00 – Site Utilities
  • 33 71 00 – Site Electrical

Important Dates:

  • Webinar: 3/16 at 3pm
  • Pre-Bid: 3/10 at 10am
  • Bid Day: 4/12

 

ACCESS TO THE BUILDINGCONNECTED PLAN ROOM

Bid Package 2

Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon Construction

Bid Package 2 Scopes of work:

33 00 00: Chilled and Soft Water Piping

Important Dates:

Bid Day: 5/4/2022

Bid Package 3

 

Scopes of Work:

  • Final Clean
  • Selective Demo
  • Remaining Concrete
  • Polished Concrete
  • Masonry
  • Remaining Structural Steel
  • Decorative Metal
  • Rough & Finish Carpentry
  • Architectural Wood Work
  • EIFS
  • Exterior Metal Wall Panels & Terracotta
  • Flashing & Sheet Metal

 

  • Joint Sealants
  • DFH
  • OH Doors
  • Stacking Glass Wall
  • Glass & Glazing
  • Framing & Drywall
  • Tiling
  • Carpet
  • Terrazzo
  • Painting
  • Signage
  • Specialties
  • Window Coverings
  • Elevators
  • Fire Suppression
  • Plumbing
  • Geothermal
  • HVAC
  • Electrical
  • Site Concrete
  • Landscaping & Irrigation

 

Bid Day: 6/30 @ 2pm

 

ACCESS TO THE BUILDINGCONNECTED PLAN ROOM

Bid Package 3

Re-bid Scopes of Work:

  • Polished Concrete
  • Sealed Concrete
  • Rough Carpentry
  • Finish Carpentry
  • Drywall & Acoustical
  • Paint
  • Elevators
  • Landscaping

Bid Day: 8/9 @ 2pm

ACCESS TO THE BUILDINGCONNECTED PLAN ROOM

Bid Package 4

Scope of Work: Decorative Metal

Out to Bid: 10/20/2022

Bid Day: 11/1/2022 @2pm

WE ARE SEEKING QUALIFIED DIVERSE INDUSTRY PARTNERS

Contact the McCownGordon Missouri S&T Team

Contact our team at s&tteam@mccowngordon.com

Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon
Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon
Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon Construction
Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon
Exterior rendering of the Missouri S&T Student Experience Center being built by McCownGordon
Construction-Jobs-Welding

Interested in joining our team?

View Construction Jobs